Provided structural design for this new 12,000 sq. ft. transmission bus building at the Embarcadero Substation in downtown San Francisco, California. The building programming includes a cable basement, 230kV Gas-Insulated Switchgear (GIS) room, MPAC room, viewing room, station service room, 5 ton crane, and battery room. The building structure consists of structural steel framing with two-story pre-cast concrete walls, concrete floors, and roof. The building is supported by a reinforced concrete mat slab. Unique pre-cast cladding elements were used on the building exterior to reflect the street front plaza area outside the building. Also, a green roof was also installed as part of the project.